I-69 Highway Corridor

FLI-MAP was selected by TX DOT to obtain a Digital Terrain Model (DTM) of 42 miles of the proposed I-69 highway corridor in Texas. FLI-MAP’s dense data set allowed good ground data to be obtained through fairly dense vegetation, and the speed and efficiency of FLI-MAP allowed for savings of 9 months in time and approximately $1.5 million in costs over conventional methods.